This is a print-friendly version of www.whitehutchinson.com/news/lenews/2010/july/article107.shtml


White Hutchinson Leisure & Learning Group

White Hutchinson Leisure & Learning Group, Kansas City, MO, USA


Vol. X, No. 4, June-July 2010


  1. Editor's corner (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article101.shtml#article)
  2. The future of out-of-home entertainment (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article102.shtml#article)
  3. Location-based entertainment center myths (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article103.shtml#article)
  4. Disney Store goes retail-tainment (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article104.shtml#article)
  5. Hybrid bowling and dinner & movie concepts grow in popularity (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article105.shtml#article)
  6. In the news (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article106.shtml#article)
  7. The phases of design (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article107.shtml#article)
  8. Adventure sports (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article108.shtml#article)
  9. New clients (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article109.shtml#article)

[ Index of Previous eNewsletters (www.whitehutchinson.com/ news/ lenews/ previous.shtml) ]


The phases of design

The design of a location-based entertainment or family entertainment center goes through a progression of different design stages, with each phase dealing with a greater level of detail. During the feasibility stage of projects, our company usually starts with the programming (figuring out the mix of attractions and all the other components of the project) and a concept floor and site plan. Many consultants don’t include a concept plan in their feasibility studies, but we have learned that it the only way to accurately estimate a project’s cost, as there can be so many variables with construction costs. Without a concept plan and detailed information on the finishes, any construction estimate will only be a guess that will often prove wrong. And in most cases, the cost is underestimated, creating serious problems once the financing is in place.

 
The mix of entertainment, play, leisure, dining and other building and site components and areas of the project are determined.



The first phase of design when the general scheme and relationships of program elements is determined and the building and site requirements are clarified.Here the focus is on creating an overall design solution that appears feasible. Drawings in this phase are composed of basic floor and site plans.

Refined design with additional development of the floor and site plans. Building elevations and conceptual building sections are typically started in this phase. Schematic design sometimes includes outline specifications indicating the types of engineering systems, glazing (glass), doors and interior finishes.

The next design phase during which the drawing and details continue to be developed. This includes detailing floor plans, elevations, and sections and producing drawings that show all building elements including stairs, windows, doors, structural plans, lighting, electrical outlets, electronics, plumbing, and mechanical systems.


The final documents that detail and provide information needed to obtain pricing, the required building permits and for the construction of the project.

In reality, it is often difficult to determine exactly where some phases start and stop, as design is a continuous progressive process.

Vol. X, No. 4, June-July 2010


  1. Editor's corner (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article101.shtml#article)
  2. The future of out-of-home entertainment (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article102.shtml#article)
  3. Location-based entertainment center myths (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article103.shtml#article)
  4. Disney Store goes retail-tainment (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article104.shtml#article)
  5. Hybrid bowling and dinner & movie concepts grow in popularity (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article105.shtml#article)
  6. In the news (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article106.shtml#article)
  7. The phases of design (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article107.shtml#article)
  8. Adventure sports (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article108.shtml#article)
  9. New clients (www.whitehutchinson.com/ news/ lenews/ 2010/ july/ article109.shtml#article)

[ Index of Previous eNewsletters (www.whitehutchinson.com/ news/ lenews/ previous.shtml) ]



Mailing Address: White Hutchinson Leisure & Learning Group, 4036 Baltimore Avenue, Kansas City, Missouri 64111, USA
Telephone: +1.816.931-1040, Fax: +1.816.756-5058
E-mail: Please direct all messages for Leisure, Entertainment and Recreation Projects to Randy@whitehutchinson.com; and all messages for Children's Learning and Play Projects to Vicki@whitehutchinson.com.

© 1999 - 2026, White Hutchinson Leisure & Learning Group, Inc.
The contents of this website and eNewsletters are protected by USA and international copyright law. Permission is granted to download and print single copites of any of the contents or articles for personal use. No other copies may be made. Educational institutions may obtain permission to make multiple copies for classroom use by e-mailing us with details. The contents of articles may be quoted provided credit is given to the "(author's name), White Hutchinson Leisure & Learning Group, Kansas City, MO, USA". All other rights for use or reproduction of the contents and articles are reserved.